Pieter project managed these two complex schemes, one on a complex gradient and the other adjacent to the DLR link to London City Airport. The City airport scheme required archaeology digs carried out by Museum of London Archaeology Services who uncovered iron-age timber jetties that would have provided access to the Thames River at the time.
Service – Pieter project managed these two commercial schemes
St John Therapy Centre, Wandsworth and Green Wrythe Lane Clinic, Carshalton
These two medical practices were delivered for the NHS. Pieter’s role was to manage the two consultant teams and liaise with the NHS departmental heads for the two practices. The schemes included consultation rooms for GPs and practice nurses, podiatry treatment rooms, mental health consultation rooms and staff and public areas. The developments aimed to achieve excellence on the NEAT assessment and was designed to provide passive solar and acoustic controls using a uniquely designed adjustable ventilation and acoustic window panel.
Service – development consultant to Building Better Health with Chantrey
This Daniel Libeskind designed project will provide the University with a landmark building with facilities to manage the postgraduate courses as well as provide a focus for the students and University. The building will house flexible conference facilities and dedicated study areas.
Service – client-side senior project manager at LMU
In support of the University’s development strategy to have a single access campus it needed to link its facilities on either side of the Holloway Road. The Zaha Hadid bridge design would facilitate this and provide improved safe access and make the campus more accessible to disabled students and staff. The dynamic design could also support information technology and be a landmark banner for the university.
Service – client-side senior project manager at LMU.
In order to improve the access and quality of the intermediate spaces a significant estate regeneration plan was adopted. The external connecting landscaped area provides a social space, which is licensed, and accessible by all. It connected the main entrance to lecture halls, student facilities and an internal distribution centre.
Service – client-side senior project manager at LMU.
A complete refurbishment of the multi-use social and recreational facilities, including two bars, nightclub, coffee shop, retail and franchise outlets, games area, offices and reception. Pieter managed the project to re-address the brief, select an architect, oversee the second set of tender issues, returns and analysis and manage the project. The scheme was increased turnover for the commercial facilities by over 400% and winning an award for the best student venue in the country later that year.
Service – client-side senior project manager at LMU
Left
Role: client-side senior project manager at LMU
Left
This highly sustainable project next to the Grade 1 listed St James the Less Church in Pimlico. It has 39 flats of which 31 are key worker homes rented out at a discount to the market. This was the inaugural project for Dolphin Living and Pieter set up their employer’s requirements, design standards and consultant selection taking the scheme to RIBA Stage 3.
Service – development consultant to Dolphin Living with Pocket.
2014 – Resi Awards, Shortlisted: Development of the Year
2014 – Housing Design Awards, Shortlisted
2014 – Evening Standard New Homes Awards, Winner – Best Small Affordable Development
2013 – Civic Trust Awards, Commendation
2013 – 24 Housing Awards, Winner
2013 – Building Awards, Shortlisted: Housing Category
Development Appraisals and Proposals
Mix was asked to review the stalled planning proposal scheme and suggest ways to improve its viability. Submitted for planning was a 3-4 storey scheme of 21 flats with complex layouts. It incorporated solar PVs, heat exchange units, a lift, sprinkler system and substantial water storage tank.
We provided a report on the proposed scheme highlighting cost saving measures and site development options.
On the same footprint, we illustrated that we could provide 23 homes that could be undertaken in a more cost-effective manner. Our proposal, as illustrated, provided:
Tanner’s Hill
The development is designed to fit in a tightly constrained site with restrictive rights-of-light and overlooking issues. It consists of a 3 and 4-storey block with generous roof terracing and communal gardens.
Accommodation
10 (77%) Intermediate
3 (23%) Open Market
13 Total
| Intermediate Housing | |||
| No | Area | Type | |
| Tier 1 | 1 | 38m2 | 1-bed |
| Tier 2 | 1 | 38m2 | 1-bed |
| Tier 3 | 2 | 50m2 | 1-bed |
| Tier 3 | 5 | 50m2 | 1-bed |
| Tier 3 | 1 | 61m2 | 2-bed |
| 10 Total | |||
| Private Sales | ||
| No | Area | Type |
| 3 | 74m2 | 3-bed |
| 3 Total | ||
61 Wallis Road
This project is designed to fit within the scale and mass of the scheme granted planning permission. It is set over four storeys with the ground floor as commercial space.
Accommodation 14 (64%) Intermediate 8 (36%) Open Market 22 Total
| Intermediate Housing | |||
| No | Area | Type | |
| Tier 1 | 2 | 38m2 | 1-bed |
| Tier 2 | 4 | 38m2 | 1-bed |
| Tier 3 | 9 | 50m2 | 1-bed |
| Tier 3 | 1 | 61m2 | 2-bed |
| 14 Total | |||
| Private Sales | ||
| No | Area | Type |
| 6 | 50m2 | 1-bed |
| 2 | 85/62m2 | 2-bed |
| 12 Total | ||
To evaluate the site’s potential Mix has maximised the scale, mass and full length of the site. Our proposal seeks to provide open access to the grounds, save the ground floor properties which are provided with private terraces. This concept allows the landscaping to reflect the design of the developments around the site and better integrate them. We have included a green wall, a feature successfully provided on previous schemes to soften the edge, improve the visual amenity and increase bio-diversity.
To the west of the site, we have proposed a café or other commercial area with associated external terrace in a stretch of road with limited public amenities. We will seek to restrict the use class to mitigate any anti-social behaviour.
At higher level, where the building steps back, we will create private terraces and, at the lower west end, we are proposing a communal terrace with planter beds and seating.
The majority of flats to the south of Cable Street face south, away from this site. Potential overlooking has been minimised through maintaining a minimum of 18 metre distance between the windows in the existing and proposed flats. Where the buildings are closer, the proposed flats will face away from neighbouring properties, as do the flats opposite.
We have sought to minimise the removal of trees, though some of the younger and smaller ones will need to be either removed. New planting is being proposed at the west end of the site. It may be necessary to pollard some of the larger trees.
Cable Street has a very important social history whose integrated community lessons we continue and celebrate. As evidenced by the mix of flat types, sizes and the affordability of the homes to people on a range of incomes, this development has been conceived to support this integration.
The design also supports this through the provision of:
This is a highly sustainable development based on a housing model that is affordable in perpetuity using a fixed-share equity model. All the 108 flats will be sold as Affordable Intermediate homes at a range of 20% to 62.5% discount to open market prices to singles, couples and families. We proposed Tier 1 homes are sold to people with a household income of £25,000 or less, Tier 2 homes at £35,000 or less, Tier 3 at £50,000 household income or less, and Tier 4 at Mayor of London thresholds.
52-62 Palmerston Road
This development, stepping from 2 to 6 storeys, is designed to complement the adjacent building heights and to the previous scheme. It can provide communal and private roof terraces and gardens. One-for-one bicycle parking with car parking are located on part of the rear garden.
Accommodation 41 (70%) Intermediate 15 (30%) Open Market
| Intermediate Housing | |||
| No | Area | Type | |
| Tier 1 | 2 | 38m2 | 1-bed |
| Tier 2 | 4 | 38m2 | 1-bed |
| Tier 3 | 19 | 50m2 | 1-bed |
| Tier 3 | 14 | 61m2 | 2-bed |
| 41 Total | |||
| Private Sales | ||
| No | Area | Type |
| 7 | 50m2 | 1-bed |
| 8 | 61m2 | 2-bed |
| 15 Total | ||
Mix has secured the Chiswick High Road site from the GLA’s Small Sites Programme.
It will deliver 28 homes, 14 of which will be intermediate affordable sold at various fixed discounts to the open market, with no rent paid on the portion not bought.
Refurbishment of a semi-derelict house that had been used as a kindergarten into a high-end rental property for the Sisters of Sion.
The new home has formal and informal living areas, two principle bedrooms with en-suite bathrooms, a study and four family bedrooms.
The site is located in the heart of Basildon which is a 30-minute train journey from London’s City area and provides 425 economic residential units for new home buyers. The scheme was design and achieved planning permission in 9 months.
Having designed the studio fit out for Bill Bailey, I was asked to design the integration of the adjoining site to form a larger family home. The existing flat with extended garden was designed in a modern Balinese style. It is intended that the integrated site will continue this trend and include 2 en-suite bedrooms, and extended living room, courtyard and lap pool.
The site contains 2 Grade II listed building, one a sailmakers’ loft and the other the former Caird & Rayner, desalination system manufacturer for the shipping industry. The two book end sites are designed as new build housing with the Caird & Rayner building having flats designed within its fabric. The sailmakers’ loft is allocated for community use including potential ateliers or student facilities for London Metropolitan University.
This development comprises of eight luxury 3-bedroom flats with covered secure parking. The building is a square plan with four feature turrets creating balconies with extensive views. The street façade reflects the more formal architecture of Tunbridge Wells. The shared rear landscaped garden and view facing side was sculptured and cut back, creating views and access to each flat’s sunny private balconies.
This project required the full demolition of the house barring the front façade. The house was converted from a 2-bedroom house to a 4-bedroom house with a new kitchen dining living space. The client wanted an open plan home that had a better relationship with the outside.
This small house is a traditional 2-up, 2-down design with the bathroom located at the end of the narrow kitchen space.
We extended the building to fill in the width of the site and swapped the bathroom and kitchen around to make it safer and make the bathroom more discreet. This allowed the dining area to relate to the rear garden and brought in much needed light into the home.
The project was for the erection of a single storey rear extension to incorporate an accessible shower room with a WC, basin and a laundry area for the elderly resident.
Although not subject to planning approval, during the works an exercise will be undertaken to remodel the kitchen layout to make it more ergonomic and safer to use.
The works included improvements to the insulation levels and improve the daylight of the house by replacing two bedroom windows and the bathroom window with matching double-glazed, timber windows.
Millard Terrace RM10 – Estate Regeneration
This estate of 156 homes has had little attention for many years and has become significantly run down. The aim was to improve security, deal with anti-social behaviour and regenerate it so that it is a positive place for people to live in.
We proposed:
Tintagel Drive
Mix secured the Tintagel Drive site from Harrow Council via the GLA’s Small Sites programme.
The light and airy homes will sit on a disused carpark and are designed to neatly fit in the restricted site area. The layouts will be completed in accordance with buyers’ requirements. A large secure lightwell to the rear provides cross ventilation whilst preventing overlooking. The upper-level features an expansive living and dining room with a discrete kitchen and family room.
It will deliver three, 3-bed terraced homes that are highly adaptable and sustainable.
1 Burdett Road
Gerhard Richter Cage Series + Phillip Glass inspired design.
I opted for Phillip Glass’s music as I found it held a rhythm that I could work with. I conceived this design as a medium to reflect the movement of city life having seen Richter’s work at the Tate. The building would be animated on a number of levels;
The development provides 56 homes and 750m2 of commercial space.